So the sun was out today and I decided to work on the foundation for the windmill.
I finished building the form for the concrete,
placed it so that the corners point to the cardinal points,
dug out the spot,
placed and leveled the form,
put a thin layer of gravel on the bottom.
Here is a pick of the form ready for fill rock and concrete.
Form placed and leveled prior to adding gravel to the bottom.
|
I will add rock to both add strength and take up space so I use less concrete when I pour it.
Still have to assemble the base of the windmill and make the anchor system for it.
I am thinking of some angle iron welded in a square with the bolts in it for an anchor system.
the angle iron will be set in the concrete with only the bolts protruding.
If I do that I know I will not have to worry about the windmill being blown over.